Step 1 of 6
Identity
No manual input is captured here: this step is completed from the preceding sections or by the platform.
No manual inputs in this step.
Step 1 of 6: Identity
SWIFT Customer Security Programme
Phase 2 · Technical controlsPer-control self-assessment, independent assessment, policy evaluation, and exception/remediation tracking for 32 CSCF controls.
Basis: Assessment
/swift-csp/assessSWIFT Customer Security Controls Framework (CSCF v2025/v2026)
6 steps, completed in order. Each step is validated against the schema before the next unlocks.
Step 1 of 6
No manual input is captured here: this step is completed from the preceding sections or by the platform.
No manual inputs in this step.
Step 2 of 6
Complete the Implementation fields. Each value is validated against the schema before the next step unlocks.
Implementation Status (required)
implementationStatusEnter implementation status.
Implementation Summary (required)
implementationSummaryEnter implementation summary.
Implementation Owneroptional
implementationOwnerEnter implementation owner.
Last Implemented / Reviewedoptional
lastImplementedDateEnter last implemented / reviewed.
Step 3 of 6
No manual input is captured here: this step is completed from the preceding sections or by the platform.
No manual inputs in this step.
Step 4 of 6
Complete the Assessment fields. Each value is validated against the schema before the next step unlocks.
Assessment Outcomeoptional
assessmentOutcomeEnter assessment outcome.
Assessor Typeoptional
assessorTypeEnter assessor type.
Assessor Nameoptional
assessorNameEnter assessor name.
Assessment Dateoptional
assessmentDateEnter assessment date.
Assessor Findingoptional
assessorFindingEnter assessor finding.
Reason for Re-assessmentoptional
reassessmentReasonSubstantive justification for reopening this control for evidence review.
Emergency Ticket Referenceoptional
emergencyTicketRefIncident or change ticket tracking this provisional emergency declaration.
Emergency Justificationoptional
emergencyJustificationOperational rationale and blast radius justification for provisional emergency override.
Emergency Declared Byoptional
emergencyDeclaredByEnter emergency declared by.
Emergency SLA Expirationoptional
emergencyExpiresAtEnter emergency sla expiration.
Step 5 of 6
Complete the Exception / Risk fields. Each value is validated against the schema before the next step unlocks.
Exception / risk-acceptance claimed?optional
exceptionClaimedEnter exception / risk-acceptance claimed?.
Exception Basisoptional
exceptionBasisSelect exception basis.
Exception Rationaleoptional
exceptionRationaleAt least 50 characters. Explain why the control cannot be met and what residual risk that leaves — an assessor has to be able to weigh this.
Compensating Controloptional
compensatingControlRequired when the exception basis is a compensating control. Describe the control that covers the gap.
Board Resolution ID (Risk Acceptance)optional
boardResolutionIdRequired when the basis is board risk acceptance. Enter the resolution that records the decision.
CFO / Board Sign-off Dateoptional
cfoSignOffDateRequired when the basis is board risk acceptance. The date the CFO or board signed off.
Exception Expires Atoptional
exceptionExpiresAtEnter exception expires at.
Step 6 of 6
Complete the Remediation fields. Each value is validated against the schema before the next step unlocks.
Remediation required?optional
remediationRequiredEnter remediation required?.
Remediation Deadlineoptional
remediationDeadlineRequired for a non-compliant outcome — the date the gap will be closed by.
Remediation Owneroptional
remediationOwnerRequired for a non-compliant outcome — the person accountable for closing the gap.
Linked Remediation Plan IDoptional
remediationPlanIdEnter linked remediation plan id.
Continue with the next guide in this framework's table of contents.
Mandatory external or internal independent assessor audit, segregation of duties enforcement, and certification.
Read guide Phase 2 · Technical controlsTracking of non-compliant control findings, remediation milestones, SLA breach escalation, and board risk acceptance.
Read guide Phase 2 · Technical controlsBilateral consent, active data exchange, and regulatory transparency with counterparty institutions.
Read guide