Step 1 of 3
Identity
Complete the Identity fields. Each value is validated against the schema before the next step unlocks.
Conformance Name (required)
conformanceNameEnter conformance name. An example value is "FY2026 CUI Enclave Topology".
Organization Entity ID (required)
entityIdThe organisation or system this record is about — lowercase with dashes, e.g. acme-corp-hq. Pick one you have used before, or type a new id to create it.
Topology Source Type (required)
sourceTypeEnter topology source type.
Uploaded Document Reference (required)
uploadRefEnter uploaded document reference. An example value is "Uploaded document reference".
