DeshCyber Logo

Engagement model

How an engagement actually runs.

A DeshCyber engagement runs in four stages — onboard, instrument, operate, attest — and each stage ends in a dated artefact the client keeps whether or not the engagement continues.

No discovery theatre and no maturity scores. The first stage produces a scoped control register; the last produces evidence an assessor can verify without us.

The four stages

01

Sequential, time-boxed, and each closed by an artefact rather than a status call.

  1. 01

    Onboard

    Scope the obligations that apply, name the control owners and agree what evidence counts.

    ArtefactScoped control register.

  2. 02

    Instrument

    Connect the systems that already hold the truth so evidence is collected where work happens.

    ArtefactLive evidence feeds.

  3. 03

    Operate

    Run the published rules continuously, route exceptions to owners and keep the record current.

    ArtefactDated verdicts and exception log.

  4. 04

    Attest

    Package the evidence for the board, the regulator or the assessor in the format each expects.

    ArtefactFiling-ready evidence pack.

The three disciplines behind it

02

Separate functions with separate accountability, so no team grades its own output.

Rule research

Reads regulatory text, assessor guidance and enforcement history, then expresses it as a versioned, testable rule.

Accountable to

Research function, per-framework control owner.

Evidence engineering

Builds the collectors and exports that turn live system activity into artefacts with inputs and timestamps attached.

Accountable to

Engineering function, platform owner.

Assurance review

Re-runs rules independently, samples verdicts and challenges anything that cannot be recomputed.

Accountable to

Assurance function, independent board line.

Terms, stated before you ask

03

The commercial and operational facts most reviewers need in the first meeting.

Entry point
One framework, one entity

We start where the deadline is closest, then reuse the evidence elsewhere.

First artefact
Within the onboarding stage

The control register lands before any platform work is committed.

Team shape
Named owners on both sides

One control owner from the client, one delivery owner from us.

Reporting
Board-ready and assessor-ready

The same underlying record is exported for each audience.

Success measure
Time from event to filed evidence

Agreed at onboarding and reported for the life of the engagement.

Exit
Evidence stays with the client

Records, rule versions and exports remain usable if the engagement ends.

Bring us the framework with the nearest deadline.

We will scope it, name the evidence and show you the artefact the first stage produces.